This past few days, i was busy with the ramp construction of my Dad's house. We were busy planning the design and with measurements to be able to fit the size of the wheelchair and the design of the railings and the tile color combination. We have decided to change the concrete flooring into non-slip decorative tiles. I instructed the two laborers to remove the existing concrete flooring to give way to the new 16x16 decorative tiles. We were already halfway on our time table because we need to finished the construction before December 20 or finished the job as soon as possible because we still have a lot of work to do in my Maligaya garden. I am pretty sure that we can finished the job on the right schedule so that by Christmas day we will have a new veranda with matching steel railings.